Green Earth has become a more professional and full-fledged company since a decade development.
greenearthcn@greenearthcn.com +86 13823531612
Author :Green earth– LED Strip Lights manufacturers
1. Before installation, you must check the integrity of the LED industrial mine lamp and the full accessories.
Second, the installation must be required, the installer holds a professional electrician certificate.
Third, the connection on the LED luminaire can be fixed from the drilling, and the wiring after the connection behind the lamp can be fixed by the wire, and ensure that the fixed is firm.
4. To ensure that the power cord of the luminaire has sufficient length, don't be subject to tension or tangent.
V. Products and flammable materials must be guaranteed.
In short, after the installation is complete, it is necessary to perform a power-on test. If some of the lamps cannot be lit, then the circuit or light is problematic. After ensuring that all the lamp is normal, the installation of the LED indillant lamp is completed.
Copyright © 2021 GREENEARTH | Sitemap